The Lock Gates at St Andrews Harbour needed to be replaced after flash flooding caused damage in 2012. The gates are vital to the harbour’s operation as they provide protection for vessels during Easterly storm surges and control the build-up of sand and silt that would render the harbour unusable.
TIMESCALES: 4 week delivery achieved as contracted
TIMBER REQUIREMENTS:
Greenheart heel post and mitres
VALUE ADDED:
Heel posts were machined to a semi-circular finish and Mitre posts were shaped and drilled to specification
Here to help
Please see our services page for our sawmilling value add services.
If you would like to discuss your project or your specific requirements, please call us on 01389 752333 or send an email to sales@gilmouraitken.com.