Stornoway Harbour RORO ferry berth which takes the new Caledonian Macbrayne vehicular ferry.
TIMESCALES: 6 weeks delivered on schedule
TIMBER REQUIREMENTS:
350mm x 350mm Greenheart piles in varying lengths from 15m to 18m.
Opepe fendering 150mm x 300mm.
VALUE ADDED:
Greenheart piles were drilled where appropriate and ringed and shed. Opepe timbers were shaped and drilled to specification.